Close Menu
London ReviewsLondon Reviews
  • Home
  • What’s On News
  • Going Out
  • Reviews
  • Spotlight
  • AI News
  • Tech & Gadgets
  • Travel
  • Horoscopes
  • Web Stories
  • Forgotten eBooks

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot
How to integrate modern Metros into unplanned neighbourhoods & local transport

How to integrate modern Metros into unplanned neighbourhoods & local transport

March 31, 2026
Report finds ‘optimism bias’ in council projections

Report finds ‘optimism bias’ in council projections

March 31, 2026
Tackling the youth justice system’s persistent challenges

Tackling the youth justice system’s persistent challenges

March 31, 2026
Facebook X (Twitter) Instagram
  • Privacy
  • Terms
  • Advertise
  • Contact
Facebook X (Twitter) Instagram
London ReviewsLondon Reviews
Subscribe
  • Home
  • What’s On News
  • Going Out
  • Reviews
  • Spotlight
  • AI News
  • Tech & Gadgets
  • Travel
  • Horoscopes
  • Web Stories
  • Forgotten eBooks
London ReviewsLondon Reviews
Home » Environment Agency minded to grant incinerator permit at Swadlincote
What's On News

Environment Agency minded to grant incinerator permit at Swadlincote

September 10, 20253 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram WhatsApp
Environment Agency minded to grant incinerator permit at Swadlincote
Share
Facebook Twitter LinkedIn Pinterest Email
  • Environment Agency launches consultation period on draft decision
  • R & P Clean Power Limited applying to run energy from waste facility
  • Consultation to run from 10 September to 8 October 2025

R & P Clean Power Limited applied for an environmental permit to operate an Energy Recovery Facility incinerating non-hazardous waste facility at Swadlincote Energy Recovery Centre, Keith Wilshee Way, Swadlincote, DE11 9EN.

After reviewing comments and evidence from the original consultation the Environment Agency is ‘minded to’ issue the environmental permit.

This means after exploring the issues and concerns that have been raised, the Environment Agency cannot find any reason to refuse the application, but is yet to make a final decision.

The consultation into the ‘minded to’ decision documents will run from 10 September 2025 to the end of 8 October 2025.

The initial online public consultation periods were from 28 June to 2 September 2024 and then from 1 November to 13 December 2024.

The Environment Agency may only refuse a permit application if it does not meet one or more of the legal requirements under environmental legislation, including if it will have an unacceptable impact on the environment or harm human health.

If all the requirements are met, it is legally obliged to issue a permit. 

The draft decision document explains the Environment Agency’s decision-making and outlines how it has considered the comments from the original consultation. The draft permit outlines the conditions needed to be met if the permit is granted.

The Environment Agency would only issue the permit if it is satisfied the operator could comply with the permit conditions. As well as having appropriate systems in place to operate the incinerator without causing harm to the environment, human health or wildlife.

The documents and comment are available on our online Citizen Space web page at the following link: DE11 9EN, R&P Clean Power Limited, EPR/LP3327SK/A001: environmental permit draft decision advertisement – Environment Agency – Citizen Space

Once people access this page they will be directed to where they can make comments in the Online Consultation.

If they scroll down this page, they will find the list of documents, including the draft permit variation and draft decision document. 

People can respond to the consultation directly on the website or alternatively by email to [email protected]

Those unable to view the documents or make representation via the consultation website or by email should contact the Environment Agency on 03708 506 506.

Background

The facility is designed to process up to 230,000 tonnes per year of non-hazardous waste

The proposed site also has planning permission which was granted on 04/08/2025.

Environmental permits 

  • Environmental permits set out strict legal conditions by which an operator must comply in order to protect people and the environment. Should an environmental permit be issued, the Environment Agency has responsibility for enforcing its conditions.
  • The Environment Agency’s powers include enforcement notices, suspension and revocation of permits, fines and ultimately criminal sanctions, including prosecution.
  • The Environment Agency may only refuse a permit if it does not meet one or more of the legal requirements under environmental legislation, including if it will have a significant impact on the environment or harm human health. If all the requirements are met, we are legally required to issue a permit.

For more general information about our permitting process please see Environmental permits – GOV.UK

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

How to integrate modern Metros into unplanned neighbourhoods & local transport

How to integrate modern Metros into unplanned neighbourhoods & local transport

March 31, 2026
Tackling the youth justice system’s persistent challenges

Tackling the youth justice system’s persistent challenges

March 31, 2026
David Hoffman’s Easter In Stepney

David Hoffman’s Easter In Stepney

March 31, 2026
Ofsted to inspect early years providers more frequently

Ofsted to inspect early years providers more frequently

March 30, 2026
Monday’s Friday Reads for 30 March

Monday’s Friday Reads for 30 March

March 30, 2026
YJB Board Member becomes Victims’ Commissioner Chief Executive  

YJB Board Member becomes Victims’ Commissioner Chief Executive  

March 30, 2026
Editors Picks
Report finds ‘optimism bias’ in council projections

Report finds ‘optimism bias’ in council projections

March 31, 2026
Tackling the youth justice system’s persistent challenges

Tackling the youth justice system’s persistent challenges

March 31, 2026
David Hoffman’s Easter In Stepney

David Hoffman’s Easter In Stepney

March 31, 2026
NHS Staff Earnings Estimates, January 2026

NHS Staff Earnings Estimates, January 2026

March 31, 2026
Latest News
Nestle update on KitKat shortage fears after 400,000 bars stolen

Nestle update on KitKat shortage fears after 400,000 bars stolen

By News Room
Ofsted to inspect early years providers more frequently

Ofsted to inspect early years providers more frequently

By News Room
Trees Save Lives exhibition at Royal Free Hospital

Trees Save Lives exhibition at Royal Free Hospital

By News Room
London Reviews
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact
  • Disclosure
© 2026 London Reviews. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.